After ACS(check-in system) initialized for a specific flight and if the schedule changes during this time the checked in passengers were offloaded by the system.
The schedule change was run during the check-in period, causing damage to all check in data. It is imperative to delete and reinitialized the flight after any schedule change perform during the ACS period.
Please, make sure to remove the flight and reinitialize it after any SC run to a flight that has already been initializing in check in. Schedule changes during the ACS period are not recommended as it usually leads to problems.
Related Articles
sabre Log Take
When some errors are occurred on Sabre for further investigation before we send to sabre sometimes taking log is mandatory To do that follow the below steps . Go to interact Menu bar Tools-->Enhanced Sabre Replay-->ON On the Ctr+H window ...
CONFIGURE TIFT TABLE ON SABRE
The below steps need to be followed to update TIFT table to automate Sabre related information 1. Display TIFT via below command T/S/* 2. To add command (EXAMPLE TO SEND PCD DATA TO FILE ) ...
Airlift Manager Run ET_Sabre sonic_import jobe
Steps to be followed to run ET_Sabre sonic_import.sh for schedule in case server is down . Step 1 :-Login to the server by addressed given via Tode Step 1 :-Change the home directory to CD /u01/ovnprod/batch Step 1 :- ./ET_sabresonic_import.sh ...
How to check code share agreement on sabre system
How to check Code share agreement on sabre system with different carrier. TAGT*WB--------------To dispaly code share existnace TOCS*C/WB---To display the class mapping TOCS/2----To display the class mapping KSIF*-WBTest the flight KA*ET807--To ...
estafftravel system problem
Problem: 1. the system couldn't retrieve the available flights as per the user request. 2. web service ( https://webservices.sabre.com/websvc ) unable to communicate. Error Message : The remote server returned an error: (403) ...