Schedule Manager Crone job adjustment

Schedule Manager Crone job adjustment

Schedule Manager Crone job adjustment whenever time change request comes from the user. for adjustment follow the below steps 

1. First login to the server 
2.Display all the cronjobs configured by   
                    Crontab -l
3. Identify which jobs are need adjustment
4. open the cron job again by edit mode by 
                Crontab -e
5.Edit and leave the cronjob by the save and quite by the below command 
      Press Esc, Then :wq
For the time configuration it can be googled.
    • Related Articles

    • Step to run Schedule Manger Script monitoring and How to check the script was run correctly

      Dear  Greetings! Find the attached steps to run the Schedule Manager script. D+7:     ./ ET_mc_ssm_D7.sh  D+3:   ./ET_mc_ssm.sh Use the below path: /MC/ASM_NEW_BKP== to check the script was runing or not on FTP /u01/avnprod/batch/logs == to check on ...
    • Month Closing COPA bulk Missing Adjustment Kostare

      Problems  which may occur during month closing 1.Difficulty in INFANT data processing -: This issue appears on closing day, Finance and Statics team will not be able to update the infant data. Here we have to check Middleware Database weather the ...
    • Airlift Manager Run ET_Sabre sonic_import jobe

      Steps to be followed to run ET_Sabre sonic_import.sh for  schedule in case server is down . Step 1 :-Login to the server by addressed given via Tode  Step 1 :-Change the home directory to CD /u01/ovnprod/batch Step 1 :- ./ET_sabresonic_import.sh ...
    • Incorrect Username and password on Contract Manager Account problem[AydenfuA]

      If you get such contract manager error(check the attached error message screenshot), report to Sabre team (Email: productsupport.helpdesk@sabre.com) like the below. Dear Team Greetings! Please assist us on the below error, when we try to open ...
    • Checked In Offloaded by system

      After ACS(check-in system) initialized for a specific flight and if the schedule changes during this time the checked in passengers were offloaded by the system. The schedule change was run during the check-in period, causing damage to all check in ...